Park Lane Reservoir Bolton. The scheme involved the removal and replacement of a 280M long, 3M high, failed existing mass masonry retaining wall. The project was completed between an existing reservoir and busy carriageway. Traffic disruption was kept to a minimum allowing two way traffic through 90% of the construction phase and was completed within time and budget.